Current projects.  Please come back and take a look at progress.

Weybridge kitchen, hallway and cloakroom toilet refurbishment.  We will be removing the skating entrance door and installing new french doors as entrance to the kitchen. We will make the opening to the rear extension wider to open up the room as well as removing a dividing wall in the kitchen.   October 17

Old kitchen and dividing wall now removed, ready for knock through and plastering.

Egham main bathroom refurbishment.  Here we will be removing the existing suite, re positioning the toilet, basin and radiator locations.  We will build bespoke storage niches with integrated lighting and then tile from floor to ceiling. September 17

1st Fix plumbing and carpentry insalled.

Bathroom now tiled and complete with bespoke niches and integrated lighting.

Hampton ensuite. Here we will be removing the front wall from the bathroom and moving it out to make the bathroom bigger to allow for morr spacious design, removing the bath and installing a shower and re configuring remaining layout. 

Bathroom complete and works really well with the new space created  by moving the main wall out 40cm into the room.  Top lit shower niche activated by motion sensor.

Main bathroom Maidenhead.  Here will be removing the existing bathroom and re configuring the room to move the toilet and basin to another wall and cretaing bespoke niches.  Door will be moved over 30cm to allow for re configuration. June/2017

1st Fix plumbing installed, carpentry completed all walls ready for tiling.

Bathroom removed and ready for work.

Bathroom complete. Top lit niche and recessed stoarge cabinet to introduce some ambient lighting.  Toilet and basin moved to new position and room fully tiled.

Staines main bathroom. Here we have alarge bathroom with airing cupboard, we will be removing the existing bathroom and airing cupboard and moving hot water cylinder to adjacent room.  We will be installing a wet floor and building bespoke wall storage and niches to include integrated lighting. Please see picture below before we start work. May/2017

Old bathroom now removed, airing cupboard removed an hot water cylinder relocated.  Room currently being prepared with with wet room installation ready for water proof tanking.

Bathroom now complete and ready to use.

En suite bathroom Camberley.  Here we are removing the existing shower enclosure and all tiles.  Then we will be installaing a wet room with new stud walls and fitted furniture.  Toilet  and towel radiator to change location. April/2017

Old bathroom now removed.  New bathroom 1st fixed and wet area installed, walls waterproofed and furniture installed.  Now ready for tiling.

Here we installed a raised wet room area and fully tiled the room. Bathroom now tiled and final fixed.  Aqualisa digital shower with fixed head and riser rail.  Fitted furniture installed and toilet in new location. 

Chertsey. Main bathroom. Here will will be removing  all the sanitary wear and tiles. Then to install a shower in place of the bath with a wall hung basin unit and toilet with concealed cistern. April/2017

Bathroom now removed along with unsafe dividing wall. Ready for some tlc and reconstruction.

Bathroom now complete, floor to ceiling tiles, concealed cistern with back to wall pan and Matki shower enclosure.

Weybridge. Before. We will be removing the existing en suite bathroom then constructing bespoke stud work to include recessed mirror with lighting, concelaed toilet cistern with wall hung pan and enclosed bath. March/2017

Room re constructed and now tiled.

Bathroom now complete.  Custom fit mirror installed and room decorated to finish.

 Virginia Water. Before: Yes we do kitchens as well..   Kitchen plan is to remove the dividing wall between the kitchen and dining room to create open plan kitchen diner.  Feb/17

Dividing wall now removed, back door removed and bricked up.  Now for some internal plastering.

  The plastering is now complete, units in and worktops cut in place. Awaiting glass splash backs to be installed then completed photos to come.

Glass splash backs installed and kitchen in full use.

Egham. Before: Main bathroom refurbishment.. Here we have a nice blank canvas, we are to install a walk in shower, wall hung basin, concealed toilet cistern.  Ceiling to be skimmed and led downlighters installed. Feb/17

First fix plumbing installed and walls re boarded.  Walls painted with rubberised tanking paint ready for tiling

Tiling now complete and ready for final fix.

Bathroom now complete.  Final fixed, ceiling painted and ready to use.